FRP gas purification tower
Working principle
Tower body outside of the exhaust gas distributor into the tower body, and after gas distributor distribution of gas to the tower top, in the process of operation, meet the atomizer atomized liquid, gas completely saturated contact and physical absorption and chemical reaction, neutralization or absorbed liquid into the liquid box, and by the pump, neutralize or gas is absorbed is up to standard through the mist eliminator mist back into the atmosphere.
We can produce it according to the customer's requirements, and can make the products have very good integrity and good quality.
Welcome to visit us
For more details, please feel free to contact us.
Ms. Kathy
Working principle
Tower body outside of the exhaust gas distributor into the tower body, and after gas distributor distribution of gas to the tower top, in the process of operation, meet the atomizer atomized liquid, gas completely saturated contact and physical absorption and chemical reaction, neutralization or absorbed liquid into the liquid box, and by the pump, neutralize or gas is absorbed is up to standard through the mist eliminator mist back into the atmosphere.
We can produce it according to the customer's requirements, and can make the products have very good integrity and good quality.
Model number | 1-1.5 | 1-3 | 1-5 | 1-7.5 | 1-10 | 1-20 | 1-30 |
Design air volume(M3/H) | 1500 | 3000 | 5000 | 7500 | 10000 | 20000 | 30000 |
Diameter(mm) | 600 | 800 | 1000 | 1300 | 1500 | 2200 | 2700 |
2Height(mm) | 5200 | 5200 | 5200 | 5200 | 7200 | 7200 | 7600 |
centrifugal fan model | No.3.2 | No.3.2 | No.4 | No.5 | No.4.5 | No.8 | No.10 |
Air volume(M2/h) | 1637 | 3566 | 5315 | 7947 | 9440 | 17400 | 27250 |
Wind pressure(Pa) | 710 | 1520 | 1080 | 1680 | 1280 | 1080 | 820 |
Pump model | 50FS-25 | 50FS-25 | 50FS-25 | 50FS-25 | 50FS-25 | 50FS-25 | 50FS-25 |
Welcome to visit us
For more details, please feel free to contact us.
Ms. Kathy